Looking for a roofing business plan? You're in the right place.
A roofing company asks a lender and an investor for money before the first roof is sold, and the questions are specific. How many crews can the revenue pay for? How much cash sits waiting on an insurance check? What happens in a year with no hail? What does the state require before the first shingle goes down? A blank template does not show what a sound answer looks like.
This article walks through a complete sample business plan for a residential roofing contractor in Oklahoma City, section by section: the executive summary, the SWOT analysis and, in full, the financials.
Here is what the plan covers and what each part is for:
- The executive summary: shows how to put the raise, the crews and three years of results on one page
- The SWOT analysis: shows how to name a storm-dependent business's weak points without losing the reader
- The crew-capacity table: shows how jobs per crew per week and squares installed decide when the next crew gets hired
- Materials and receivables: shows how shingle costs, supplier terms and slow insurance checks shape cash
- The first year, month by month: shows which months lose money before the hail season starts, so the cash reserve can be sized to them
- The five-year profit, cash flow and balance sheet: shows how pay, pricing and hiring decisions reach the bottom line
- The slow-market case and the stress tests: gives an answer ready for the question of what a quiet hail year does to the company
A roofing company in another city will have different prices, rules and storms. The company here is fictional, so take what fits and change the rest.
In this plan
Need a roofing business plan for your own business? Book a free consultation and we write it for you.
Executive Summary
Red Earth Roofing, LLC is a residential roofing contractor that opens on January 1, 2027 from a leased shop and yard on the south side of Oklahoma City. It replaces and repairs asphalt-shingle roofs across the metro, most of it through hail and wind insurance claims, and adds light commercial flat-roof work from the second year. Founder Dale Whitaker owns 70% of the company. A family member who invests as a silent co-investor owns 30%.
Opening takes $760,000, raised as $322,000 of Dale's savings, $138,000 from the co-investor and a $300,000 bank term loan. Trucks, trailers, tools and the shop fit-out take $224,000, and $86,000 is set aside for the third crew's truck, trailer and tools in March 2029. Legal work, registrations, pre-opening pay and rent, and the launch campaign take $69,900. A refundable shop deposit takes $8,000, and the last $372,100 stays in the account as a reserve for the first winter, the build to the first hail season and a slow second year.
| Year 1 | Year 2 | Year 3 | |
|---|---|---|---|
| Revenue | $1,155,960 | $2,152,453 | $2,881,829 |
| Net income after start-up costs | ($201,696) | $23,695 | $145,795 |
| Closing cash | $291,259 | $260,816 | $290,113 |
The company starts with one four-person crew and no sold jobs. It completes 68 re-roofs and 170 repairs in 2027, adds a second crew year-round from January 2028 and a seasonal third crew from the spring of 2029. Year 1 loses money because crew, office, truck and insurance costs start on day one while revenue builds through the spring, and EBITDA is positive only in May, June, July, September and October. The first profit arrives in Year 2, and Year 2 is the thinnest year: debt cover is 1.35x.
Storm and insurance-claim re-roofs are 58% of Year 1 revenue. A second run of the model takes 20% off every revenue line. With later hiring, a smaller marketing budget, a 15% owner pay cut from July 2027 and no distributions, year-end cash never falls below $57,016 and profit returns in Year 3. A year with half the planned claim work is a harder test, and the stress section shows that case overdrawing Year 2 by $29,013 unless a standby line is in place.
The pitch is deliberately plain. Every crew member is a W-2 employee on the company's payroll, a registered contractor's own people stand behind each roof, and every claim job is priced on the insurer's scope plus documented supplements, with the homeowner's deductible collected in full.
Red Earth Roofing at a Glance
Legal name: Red Earth Roofing, LLC, an Oklahoma limited liability company. Owners: Dale Whitaker, 70%; a family member as silent co-investor, 30%. Premises: a leased 3,600-square-foot shop and fenced yard on the south side of Oklahoma City. Start date: January 1, 2027, with the shop fitted out and Crew A trained in November and December 2026. Stage: pre-launch. The lease is under review, the trucks are chosen and the registration application is ready to file.
What Red Earth is for
Replace and repair residential roofs in the Oklahoma City metro on a fixed written price, with the company's own crews, and handle the insurance paperwork on storm claims.
Targets for the first two years
- Complete 68 re-roofs and 170 repairs in 2027, with the first sales representative in place before the April hail season.
- Run a second crew year-round from January 2028 and reach $2,152,453 of revenue in 2028, the first profitable year.
- Hold the Residential Roofing Endorsement from the Oklahoma Construction Industries Board before the January 1, 2028 deadline and the commercial endorsement before the first flat-roof bid.
- Make every loan payment on schedule; principal starts in July 2027, after six interest-only months.
What the company sells
| Service | How it is priced | Year 1 share of revenue |
|---|---|---|
| Storm and insurance-claim re-roofs | About 30 squares at $560 a square, on the insurer's scope plus documented supplements | 58% |
| Retail re-roofs (age, leaks, sales) | About 26 squares at $520 a square, written bid | 33% |
| Repairs and small jobs | About $620 a job | 9% |
| Light commercial flat and low-slope roofs | About 40 squares at $780 a square, from Year 2 | 0% (11% by Year 5) |
A square is 100 square feet of roof.
The Oklahoma City Roofing Market
Hail drives the work
The Oklahoma Insurance Department's June 29, 2026 release, using Verisk data, reported that 49.7% of Oklahoma roofs were hit by severe hail over the previous four years, the highest share of any state, and 64.7% in 2025 alone. It put the average Oklahoma roof replacement at $17,631 in 2025, up 33% on recent years. Those are statewide figures for all homes. They show why claim work is the largest line in the plan and why a quiet storm year is the main risk to it.
What a roofer earns
The Bureau of Labor Statistics' May 2025 estimates for the Oklahoma City metropolitan area count 710 roofers at a mean of $22.12 an hour, or $46,010 a year, and 5,570 construction laborers at a mean of $43,420. First-line supervisors of construction trades average $77,850 and estimators $75,130. Roofers are paid $46,000, foremen $60,000 and laborers $40,000, and Dale takes $75,000, below the supervisor mean while the company is small.
Prices and rent
No primary source publishes a local price per square. The Insurance Department's $17,631 average is the dated anchor. The blended Year 1 re-roof ticket is about $15,400, about 12% below it, because the statewide average includes larger homes and impact-rated shingles. Published cost guides for Oklahoma City vary widely, are secondary, and do not describe this company's mix, so every price here is a planning figure that written local bids would replace.
CBRE reported an Oklahoma City industrial average net asking rent of $7.64 a square foot at the end of the second quarter of 2026, in a report dated August 24, 2026. Shop rent is about $13 a square foot all in, because a small-bay unit with an office and a fenced yard costs more than the market average and the figure includes service charges.
Where else a homeowner could go
| Alternative | What it offers | Why a homeowner picks it | How Red Earth differs by design |
|---|---|---|---|
| Large regional roofing companies | Big crews, financing programs, heavy advertising | Familiar name, fast scheduling | One named owner on every estimate |
| Out-of-state crews that arrive after a hail event | Fast response, door-to-door canvassing | Quick inspection | A local shop and yard, a state registration and a warranty callback that stays in the metro |
| Small one-truck roofers | Low overhead, low price | Lowest quote | Documented claim supplements, written scope, fall protection on every roof |
| General contractors and handymen | Roofing bundled with other work | One call for several jobs | A crew that roofs every day |
| Insurer-referred contractor lists | Pre-screened names from the carrier | Comfort of a recommendation | Open to any homeowner; no promise of carrier referrals |
Each row describes a category and where Red Earth sits against it. It is not a ranking, and no company is named because prices and programs change often.
SWOT
| Strengths | Weaknesses |
|---|---|
| Owner with 14 years in Oklahoma residential roofing, on the estimate every time | One estimator: when Dale is out, quoting slows |
| W-2 crews that the company schedules and trains, with the 2027 labor-only subcontractor rule no obstacle | Most of Year 1 revenue depends on hail claims |
| Cash reserve sized to a slow-market case | No brand and no reviews in January 2027 |
| Opportunities | Threats |
|---|---|
| Hail in a state with the highest share of roofs hit | A quiet hail season for several years |
| Commercial endorsement opens flat-roof work from Year 2 | Shingle prices that follow oil and supplier lists |
| A stricter 2028 endorsement rule that thins out unregistered competitors | Slow insurance checks that stretch receivables |
Who Buys a New Roof
The homeowner with a hail claim
The largest group. A storm has dented the shingles, the homeowner has filed a claim or is about to, and the insurer's adjuster has a scope of work. The homeowner wants a roofer who documents the damage, meets the adjuster and does not ask for the deductible to be waived. Oklahoma law, reported effective November 1, 2022, bars roofing contractors paid from insurance proceeds from advertising or promising to pay all or part of a customer's deductible, and requires written notice of the rule with estimates. Red Earth collects the deductible in full and gives the notice; counsel confirms the rule's current status.
The homeowner with an aging or leaking roof
No claim and no deadline. This buyer gets several bids, compares warranty terms and often finances the work through a third-party lender. Retail re-roofs are 33% of Year 1 revenue and sell on a written price, not an insurer's scope.
The small commercial owner
From Year 2, owners of strip centers, small offices and flat-roofed buildings who need a membrane repair or replacement. Commercial work pays more slowly and earns a smaller material margin, and it needs the commercial endorsement and a $1,000,000 liability limit.
What each of them asks
A written scope and price. A start date that holds. A crew that arrives on it, cleans up and photographs the finished roof. A warranty callback that a person answers.
Winning Roof Jobs
From inspection to signed contract
A homeowner calls or fills in a form. A representative or Dale inspects the roof, takes photographs and orders an aerial measurement report. For a claim job, Dale or the claims representative meets the adjuster, and the company writes a supplement for items the first scope missed. The homeowner signs a written contract with the scope, price, deposit and the deductible notice. Materials are ordered when the date is set.
The Year 1 pipeline
About 340 re-roof inspections at a close rate of 20% give the 68 re-roofs of Year 1. Repairs come mostly from search and referrals: 170 jobs. Sales, estimating and claim meetings fall to Dale until the first representative starts in April.
Where the Year 1 leads come from
| Channel | Year 1 spend | Re-roofs signed |
|---|---|---|
| Search ads and Local Services listings | $24,000 | 18 |
| Storm-zone canvassing, door hangers and yard signs | $9,000 | 12 |
| Past-customer and neighbor referral rewards | $7,000 | 12 |
| Insurance agents, realtors and lenders (meetings and events) | $6,000 | 8 |
| Local social media and neighborhood apps | $8,000 | 8 |
| Home and garden show booth and sponsorships | $7,000 | 6 |
| Direct mail to storm-hit ZIP codes | $5,000 | 4 |
| Total running spend | $66,000 | 68 |
Launch work adds $22,000, paid from the raise. Marketing is 7.6% of Year 1 revenue with the launch, 3.5% in Year 3 and 3.1% in Year 5. Across the 68 re-roofs it is $971 a re-roof for running cost alone and $1,294 with the launch.
Pricing and the claim file
Retail bids are written on measured squares at about $520 a square for architectural shingles with tear-off, underlayment, flashing and cleanup. Claim jobs are priced on the insurer's scope plus documented supplements at about $560 a square, because they carry code items, decking replacement and higher-grade shingles more often. Both prices rise 3% a year from Year 2. Claim work also depends on the file: photographs, measurement report, adjuster notes and the supplement, kept for every job.
Repeat business
Repairs turn into re-roofs when a roof reaches the end of its life, and re-roof customers refer neighbors. Repeat business enters the model only through the referral channel above and a 1.4% allowance for workmanship callbacks and bad debt.
Running the Crews
The shop and the trucks
The 3,600-square-foot shop holds a small office, racking for fasteners and flashing and a fenced yard for the trucks and trailers. Shingles are delivered to each job by the supplier's boom truck, so the company holds no stock beyond consumables. Two used one-ton crew trucks, an estimator's truck and two trailers are bought in January 2027 for $154,000, and tools and fall-protection systems for two crews cost $50,000. Crew C's used truck, trailer and tools, $86,000, are bought in March 2029 from money set aside in the raise.
How a job moves
Materials are ordered when the start date is set. The foreman checks the delivery, the crew tears off, dries in, installs and cleans up, and the foreman photographs the finished roof. The coordinator closes the permit and invoices. On a claim job the claims administrator files the completion documents with the insurer for the recoverable-depreciation payment.
What the crews can do
The table sets the work against the crew-days available. Productive days are fewer than working days because of rain, wind and heat, and Oklahoma's spring storm season stacks demand in April to June.
| Year | Crews on payroll | Crew-days needed | Crew-days available | Average use | Busiest month | Re-roofs | All jobs | Squares installed | Jobs per crew-week |
|---|---|---|---|---|---|---|---|---|---|
| 1 | A all year; B May to July | 162 | 239 | 68% | April, 96% | 68 | 238 | 1,928 | 3.7 |
| 2 | A and B all year | 289 | 380 | 76% | May, 136% | 116 | 400 | 3,448 | 3.8 |
| 3 | A and B; C April to September | 373 | 481 | 77% | May, 116% | 146 | 494 | 4,460 | 3.8 |
| 4 | A and B; C April to September | 408 | 481 | 85% | May, 127% | 158 | 533 | 4,876 | 4.1 |
| 5 | A and B; C April to September | 427 | 481 | 89% | May, 132% | 165 | 556 | 5,110 | 4.3 |
The method. A four-person crew installs 17 squares on a productive day. A repair takes 1/3.5 of a crew-day and commercial work installs 10 squares a day. Crew-days needed are re-roof squares divided by 17, plus repairs divided by 3.5, plus commercial squares divided by 10. Productive crew-days a month are 12, 13, 16, 15, 14, 16, 19, 19, 18, 19, 16 and 13 for January to December, 190 in all. Crew-days available are the crews on payroll times those days. The Year 1 monthly need uses the Year 1 job counts by month. Later years have no monthly view in the engine, so each year's need is spread by the Year 1 demand weights, and the busiest month is read on that basis. "All jobs" counts a repair as one job, "squares installed" counts re-roofs and commercial work only, and jobs per crew-week divides jobs by the weeks crews are on payroll (65, 104, 130, 130 and 130).
May needs more than the crews on payroll can do in every year from Year 2, between 116% and 136% of available crew-days. The spring backlog runs into June and July, and July and August use only 54% to 68% of crew-days. The overtime line pays for the work that runs past capacity: $6,000, $16,000, $8,000, $14,000 and $23,000 in Years 1 to 5, at about $1,200 per excess crew-day. At 15 squares a day instead of 17, Year 3 use would be 84% and Year 5 use 96%, so a fourth crew would arrive earlier than planned. A seasonal crew can leave after September; a permanent crew is paid through the slow winter months, which is why Crew B is permanent from January 2028 and Crew C is not.
Unit economics by square
A square is the unit that prices, purchases and staffing are all counted in.
| Year 1 prices | Storm and claim re-roof | Retail re-roof |
|---|---|---|
| Squares per job | 30 | 26 |
| Price per square, and per job | $560 and $16,800 | $520 and $13,520 |
| Materials, disposal and permits (40% and 41%) | $224 a square, $6,720 a job | $213 a square, $5,543 a job |
| Crew labor at $1,354 per productive crew-day and 17 squares a day | $80 a square, $2,390 a job | $80 a square, $2,071 a job |
| Commissions, financing and card fees, warranty and bad debt (5.5%) | $31 a square, $924 a job | $29 a square, $744 a job |
| Contribution before overhead | $226 a square (40.3%), $6,766 a job | $199 a square (38.2%), $5,162 a job |
| Same, with crews at Year 3's 77% use (labor $103 a square) | $202 a square (36.0%), $6,053 a job | $175 a square (33.6%), $4,544 a job |
The crew cost is Crew A's loaded wages of $257,280 ($192,000 at a 34% load) over 190 productive days. The 77% row adds the idle days that Crew A is paid for. Shingle and underlayment costs follow oil and supplier lists; the stress section prices a 10% rise with no pass-through.
Materials and supplier credit
Roofing supply is bought on account from a distributor branch once the company's credit application is approved, usually with a personal guarantee from the owner. Supplier terms are modeled at about 30 days on two-thirds of purchases, which leaves $24,966 owed at the end of Year 1 and $75,871 at the end of Year 5. A new company may start on cash terms. Without any credit, year-end cash is $24,966 lower in Year 1 and $46,488 lower in Year 2.
Insurance-claim receivables
Claim jobs pay in stages. The homeowner receives the insurer's first check for actual cash value and pays a deposit at contract. The insurer releases the recoverable-depreciation holdback after the company files completion documents, and where a mortgage lender is named on the check, funds can be released in draws after inspection. The engine takes one figure for receivable days and its monthly view has no receivables timing, so the model uses average days outstanding by job type and one blended figure.
| Job type | Share of Year 1 revenue | Cash timing | Days outstanding |
|---|---|---|---|
| Storm and claim re-roofs | 58.1% | Deposit at contract; balance from the insurer's check; depreciation holdback and any lender draw after completion | 38 |
| Retail re-roofs | 32.7% | Third-party lender or the homeowner pays at completion | 7 |
| Repairs | 9.1% | Paid at completion | 3 |
| Light commercial (Year 2 onward) | 6.0% in Year 2, 11.0% in Year 5 | Invoice on completion, net 30 with slow-pay delays | 45 |
Weighted by revenue the days are 24.6 in Year 1, 26.7 in Year 3 and 26.7 in Year 5. The model uses 27 for every year. These days are planning figures; no published source gives them for Oklahoma. A stress row at 45 days follows the financials.
Software and warranty
Estimating and customer software tracks leads, contracts, photographs, claim documents and schedules; an aerial measurement service prices each roof before the crew arrives. A written workmanship warranty and the shingle manufacturer's warranty back each roof. The 1.4% allowance for workmanship callbacks and bad debt covers the company's own warranty visits and write-offs.
Oklahoma Rules, Insurance and Safety
Registration and the new endorsement
The Oklahoma Construction Industries Board registers roofing contractors. The Board's pages describe an annual registration with proof of workers' compensation coverage or exemption, proof of lawful presence and liability insurance of at least $500,000, with failure to register a misdemeanor punishable by a fine of up to $500. The Board's June 8, 2026 notice sets out the 2025 and 2026 changes below.
| Date | Rule | What Red Earth does |
|---|---|---|
| Now | Registration with the Board, renewed annually; commercial roofing also needs a commercial endorsement and, on the Board's 2022 application form, a $1,000,000 liability minimum | Registers in December 2026 with $1,000,000 of liability cover |
| January 1, 2027 | Transition period for the new Residential Roofing Endorsement begins. Contractors registered and in good standing by this date can be grandfathered by application, fee and either 10 hours of approved continuing education or the exam. It becomes unlawful to subcontract with an unregistered labor-only crew | Completes the 10 hours in the first quarter of 2027; every crew member is a W-2 employee |
| January 1, 2028 | The endorsement is required for residential roofing work; grandfathering ends; labor-only crews must work directly for an endorsed contractor and keep proof on the job site; four hours of continuing education are required for renewal | Holds the endorsement well before this date |
| Commercial | Four hours of approved continuing education every 36 months for commercial work | Dale sits the commercial exam in 2027 for the first flat-roof bid in Year 2 |
The Board's 2022 application form lists $75 for the initial registration and $230 for the initial commercial endorsement; fees may have changed, and the Board sets the residential endorsement fee on application. Licensing costs $2,400 at start-up and $900 a year for renewals and continuing education, and the Board confirms the fees on filing.
Insurance
| Cover | Year 1 planning figure | Note |
|---|---|---|
| General liability and umbrella | about $22,000 | $1,000,000 limit; the Board must be a certificate holder |
| Commercial auto for three vehicles | about $12,000 | Crew truck, estimator truck, second crew truck from May |
| Tools, inland marine and other | about $6,000 | Equipment, trailers and cyber |
| Insurance line | $40,000 | Rises to $68,000 by Year 5 |
Workers' compensation is not in that line. It sits in the 34% load on crew payroll, at a planning figure of about 20 points. Roofing is among the costliest classes, and a broker's quote, the company's experience modification and any credits set the real number. A 10-point rise costs $39,552 of Year 2 profit and $38,915 of Year 3 profit in the stress table.
Safety
OSHA's fall protection standard for construction, 29 CFR 1926.501, applies at unprotected edges 6 feet or more above a lower level, and names low-slope roofs, steep roofs and residential construction. Fall protection is the largest risk on every roof, and the $50,000 tool budget includes anchors, harnesses and lines for two crews. The $8,000 safety and training line in Year 1 covers training and equipment inspection.
The People
Dale Whitaker, founder and owner
Dale has 14 years in Oklahoma residential roofing: five on crews, four as a foreman and five as an estimator and production manager at a mid-size Oklahoma City roofer. He writes the estimates, meets the adjusters and runs the first crew's schedule. His $322,000 is savings built over those years. He is leaving to run a smaller company where he does the selling himself.
Where the team is thin
Dale has not run payroll, supplier credit or workers' compensation for a company of his own, has never bid commercial work and has no sales team to manage. Each gap has an answer: a part-time coordinator handles scheduling and invoicing from the first month, the company's accountant reviews payroll and tax filings, the commercial endorsement exam comes before the first flat-roof bid, and the first sales representative starts in April 2027.
If Dale is out
Estimating and adjuster meetings stop when Dale is out, which is the main weakness in Year 1. The Crew A foreman can run the jobs, and the coordinator can keep the schedule moving. A production manager starts in January 2030, and the second sales representative in March 2029 can take inspections.
Outside help
An insurance broker places the liability, auto and workers' compensation cover and is asked to quote it before the loan closes. A local accountant keeps the books and files taxes. An Oklahoma construction attorney reviews the contract, the lien notices and the deductible notice. The Small Business Development Center network is a free source of advice on pricing and cash.
Ownership and the bank
Red Earth Roofing, LLC is owned 70% by Dale and 30% by the co-investor in proportion to their cash. The co-investor holds no operating role. The bank's loan rests on Dale's personal guarantee and a lien on the trucks, trailers and tools, with annual statements to the bank.
Financials: Crew Days, Material Costs and Claim Checks
A single model produces every table that follows: five years, with 2027 month by month and later years in annual columns. The sequence runs from what the $760,000 buys, through what the company sells and how many crew days that work takes, to payroll, profit, cash and the balance sheet, and ends with a slow-market case. A stress table and a list of lender questions come after the model.
Trucks, tools and the funding stack
| Use of funds | Amount |
|---|---|
| Two used crew trucks (one-ton, flatbed or dump bed): one at opening, one for the second crew | $92,000 |
| Used estimator truck | $32,000 |
| Two equipment and tear-off trailers | $30,000 |
| Tools for two crews: ladders, nail guns, compressors, tear-off shovels, roof jacks and fall-protection systems | $50,000 |
| Crew C kit bought in March 2029 (month 27): used crew truck, trailer and tools for the third crew | $86,000 |
| Shop and yard: racking, small office fit-out, fencing and lighting | $20,000 |
| Roofing registration, commercial endorsement application, city and county business registrations | $2,400 |
| Legal: LLC, contract templates and lien notices, lease review | $7,500 |
| Pre-opening: two months of shop rent during fit-out ($7,800), four weeks of pay for Crew A, the owner and the coordinator for safety training and a mock-up roof | $38,000 |
| Launch: website and local search listings, yard signs, truck wraps, first canvassing materials | $22,000 |
| Shop lease security deposit (two months of rent, refundable and held in cash) | $8,000 |
| Cash reserve for the first winter, the build to the first storm season and a slow second year | $372,100 |
| Total uses | $760,000 |
| Source of funds | Amount |
|---|---|
| Dale Whitaker's savings | $322,000 |
| Silent co-investor (family member) | $138,000 |
| Bank term loan secured on trucks, trailers and equipment | $300,000 |
| Total sources | $760,000 |
Dale Whitaker's savings supply $322,000 and a family member adds $138,000 as a silent co-investor, together 60.5% of the $760,000 raise. Ownership follows the cash: 70% Dale, 30% the co-investor. The bank term loan is $300,000 at 10% over seven years, interest only for the first six months, secured on the trucks, trailers and tools and backed by Dale's personal guarantee. The rate is a planning figure and not a quote, and the seven-year term matches the seven-year life used for the trucks. Debt is 39.5% of the raise. Trucks, trailers, tools and the shop total $224,000 at opening, start-up costs expensed at opening total $69,900, and $86,000 is set aside to buy Crew C's truck, trailer and tools in March 2029. The remaining $372,100 is the reserve, 49% of the raise. Cash balances throughout include the $8,000 shop deposit, which the landlord returns at the end of the lease, so money that can actually be spent is $8,000 less. The reserve answers the slow-market case below, which bottoms out at $57,016 at the end of Year 2 ($49,016 net of the deposit). In the base case the lowest Year 1 month-end balance is about $217,000 on the page's basis, so the raise carries more cushion than the base case needs. A quiet hail year is a harsher test than the slow-market case: with storm and claim re-roofs 50% below plan in Year 2 and no response, Year 2 closes $29,013 overdrawn, and that gap is the reason for the standby line discussed with the lender questions. A late start of two months fits inside the reserve by itself. It costs $88,007 of Year 1 net income and brings the lowest Year 1 month-end balance to about $86,000 in July 2027.
Crew days, materials and claim checks
- Jobs and prices. Year 1 completes 40 storm and insurance-claim re-roofs at an average of $16,800 (30 squares at $560 a square), 28 retail re-roofs at $13,520 (26 squares at $520) and 170 repairs at $620, which is $672,000, $378,560 and $105,400. A square is 100 square feet of roof. Prices rise 3% a year from Year 2. The tickets are planning figures. The Oklahoma Insurance Department's June 29, 2026 release, citing Verisk, put the average Oklahoma roof replacement at $17,631 in 2025, so the blended Year 1 re-roof ticket of about $15,400 sits about 12% below the statewide average, which covers larger homes and impact-rated shingles. Written local bids would replace these prices.
- Light commercial work starts in Year 2 with 4 flat and low-slope jobs at about $31,200 (40 squares at $780), then 8 jobs in Year 3 and 11 by Year 5. It needs the commercial endorsement from the Construction Industries Board and a $1,000,000 general liability limit, and it carries a heavier material share (52% of price against 40% and 41% on shingle re-roofs).
- Crew productivity. A four-person crew installs 17 squares on a productive day, counting tear-off, underlayment, shingles, flashing and cleanup on ordinary gable and hip roofs, and has 190 productive days a year, from 12 in January to 19 in July and 19 in October, with the rest lost to rain, wind, heat, material delivery waits, rework and inspections. A repair takes about 0.29 of a crew-day (3.5 repairs a day) and commercial work installs 10 squares a day. These are planning figures, not published productivity data. On those rates the crews on payroll use 68% of their crew-days in Year 1, 76% in Year 2, 77% in Year 3, 85% in Year 4 and 89% in Year 5; the monthly method and the May peak are in the crew table in the operations section above.
- Direct costs run 39.4% of Year 1 revenue: shingles, underlayment, flashing, fasteners, dumpsters and disposal, permits and delivery at 40% of a storm re-roof, 41% of a retail re-roof, 30% of a repair and 52% of a commercial job. On a storm re-roof that is $224 a square, against a bottom-up planning estimate of about $209 a square for architectural shingles, synthetic underlayment, starter and ridge, flashing and fasteners, disposal and permit, plus impact-rated shingles and decking replacement on some claims. Shingle and underlayment prices follow oil and supplier lists, so supplier quotes replace these figures. The engine applies the Year 1 rate of 39.4% to every year, and commercial work raises the true rate to 40.9% by Year 5, so a separate line adds the difference, $16,806 in Year 2 rising to $51,014 in Year 5.
- Every crew member is a W-2 employee. Crew wages are set against the Bureau of Labor Statistics' May 2025 figures for the Oklahoma City area, where roofers averaged $22.12 an hour ($46,010 a year) and construction laborers $43,420 a year: $46,000 for roofers, $60,000 for foremen and $40,000 for laborers. Crew payroll carries a 34% load: about 10 points for employer payroll taxes, about 20 for workers' compensation and 4 for everything else. The workers' compensation figure is a planning figure and not a filed rate. Roofing is among the costliest workers' compensation classes, and the actual rate depends on the insurer's filed rate, the company's experience modification and any credits, so a broker's quote replaces it. Office and sales roles carry 22%, and the part-time coordinator 15%. Raises of 3% a year are charged on their own line from Year 2.
- Pay floors and overtime. The federal minimum wage is $7.25 an hour; Oklahoma is understood to apply the federal figure to most employers, and the Oklahoma Department of Labor confirms the current rule. The lowest planned pay is the part-time coordinator at about $21 an hour for 20 hours a week, and the laborer's $40,000 works out to about $19.23 an hour. Crew roles are hourly, with time and a half beyond 40 hours a week. The overtime line is about $1,200 for each crew-day of work that exceeds what the crews on payroll can finish in a month (four people, eight hours, time and a half, plus payroll tax), read from the monthly method, with a $6,000 floor: $6,000, $16,000, $8,000, $14,000 and $23,000 in Years 1 to 5. An employment adviser decides which salaried office roles are exempt from overtime, since that turns on duties.
- Receivables run 27 days of revenue in every year. Claim re-roofs are planned at 38 days outstanding (the insurer's release of the depreciation holdback and any mortgage-lender draw), retail re-roofs at 7 (a third-party lender or the homeowner pays at completion), repairs at 3 and commercial work at 45. Weighted by revenue that is 24.6 days in Year 1, 26.7 in Year 3 and 26.7 in Year 5, and the 27 days used is the Year 3 to Year 5 level. These days are planning figures with no published source. The engine takes one receivable-days figure and builds the balance at each year end. Its monthly view has no receivables timing, so a claim check that lands 60 days after a May completion appears nowhere month by month, and the page deducts 27 days of each month's revenue from month-end cash to approximate it.
- Suppliers extend terms on part of the purchases: 20 days of direct costs are payable at each year end, which is about 30-day terms on two-thirds of purchases once a distributor approves the account. The payables balance is $24,966 at the end of Year 1. A new company may start on cash terms; the stress table prices that case, in which year-end cash is lower by $24,966 in Year 1 and $46,488 in Year 2.
- The shop and yard are 3,600 square feet at an all-in rent of about $13 a square foot, $46,800 in Year 1. CBRE put the Oklahoma City industrial average net asking rent at $7.64 a square foot at the end of the second quarter of 2026 (report dated August 24, 2026). The modeled rent is higher because small-bay space with an office and a fenced yard costs more than the market average, and it includes service charges. A listing replaces it. The deposit of about two months, $8,000, is refundable and held in cash. Utilities are $6,000 a year.
- Insurance is $40,000 in Year 1 and $68,000 by Year 5, a planning figure for a broker to confirm: general liability and an umbrella policy at about $22,000, commercial auto for three vehicles at about $12,000, and tools, inland marine and other cover at about $6,000. Workers' compensation sits in the 34% crew load. The Construction Industries Board requires liability cover of at least $500,000 for registration and $1,000,000 for the commercial endorsement; Red Earth carries $1,000,000 from the start.
- Marketing costs $88,000 in Year 1: $22,000 of launch spend, paid from the raise, and $66,000 of running cost. Across the 68 re-roofs of Year 1 that is $971 a re-roof for the running cost alone and $1,294 with the launch. Marketing is 7.6% of Year 1 revenue with the launch, 3.5% in Year 3 and 3.1% in Year 5. Sales commissions are 2.5% of re-roof revenue, financing dealer fees and card fees 1.6% of sales, and warranty callbacks and bad debt 1.4% of sales. Truck fuel, tires and repairs run $30,000 in Year 1.
- Income tax is charged at 21% federal (26 U.S.C. 11(b)) plus 4% for Oklahoma, after the Year 1 loss has been used up. Secondary sources report the Oklahoma corporate rate as a flat 4%; the Oklahoma Tax Commission publishes the current rate and the company's tax adviser confirms it. An LLC with owners is ordinarily a pass-through for tax, so charging corporate tax errs on the cautious side. The model's tax base ignores the $69,900 of start-up costs and does not apply the federal rule that carried-forward losses shelter only 80% of taxable income.
- Owner distributions are $40,000 in Year 4 and $80,000 in Year 5, split 70% and 30%. Net income after start-up costs adds up to $115,488 by the close of Year 4 and $326,011 by the close of Year 5, against $40,000 and $120,000 paid out in total, and each payout is below that year's cash after loan principal ($131,803 and $195,740). The loan stays on its seven-year schedule, so $113,687 is still owed at the end of Year 5.
Revenue by job type
| Revenue stream | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| Storm and insurance-claim re-roofs | $672,000 | $1,176,672 | $1,532,788 | $1,688,919 | $1,796,312 |
| Retail re-roofs (age, leaks, sales) | $378,560 | $668,429 | $860,602 | $975,062 | $1,065,182 |
| Repairs and small jobs | $105,400 | $178,808 | $223,638 | $247,284 | $265,170 |
| Light commercial flat and low-slope roofs | $0 | $128,544 | $264,801 | $340,931 | $386,275 |
| Total revenue | $1,155,960 | $2,152,453 | $2,881,829 | $3,252,196 | $3,512,939 |
| Growth on prior year | – | 86% | 34% | 13% | 8% |
Storm and insurance-claim re-roofs are 58% of Year 1 revenue and 51% of Year 5, retail re-roofs 33% and 30%, repairs 9% and 7.5%, and light commercial work 11% of Year 5. Claim work carries the plan, and it arrives with hail. Year 2 is 86% above Year 1 because Year 1 starts from nothing, with no reviews, no yard signs and no insurer relationships, and January's revenue is $16,000. Year 2 has 116 re-roofs against 68, a second crew on payroll all year, a billing and claims administrator from April 2028 and its first four commercial jobs; that step is the most demanding in the plan, and the quiet-hail row in the stress table prices it. Growth slows to 34%, 13% and 8% as the three crews fill.
Year 1: a winter start and the first hail season
| Month | Storm and insurance-claim re-roofs | Retail re-roofs (age, leaks, sales) | Repairs and small jobs | Light commercial flat and low-slope roofs | Total revenue | EBITDA |
|---|---|---|---|---|---|---|
| Jan 2027 | $0 | $13,520 | $2,480 | $0 | $16,000 | ($54,319) |
| Feb 2027 | $16,800 | $13,520 | $3,720 | $0 | $34,040 | ($43,390) |
| Mar 2027 | $33,600 | $27,040 | $5,580 | $0 | $66,220 | ($23,894) |
| Apr 2027 | $67,200 | $27,040 | $9,300 | $0 | $103,540 | ($1,284) |
| May 2027 | $117,600 | $40,560 | $10,540 | $0 | $168,700 | $38,193 |
| Jun 2027 | $100,800 | $40,560 | $11,780 | $0 | $153,140 | $28,766 |
| Jul 2027 | $67,200 | $40,560 | $11,160 | $0 | $118,920 | $8,034 |
| Aug 2027 | $50,400 | $40,560 | $9,920 | $0 | $100,880 | ($2,895) |
| Sep 2027 | $67,200 | $40,560 | $9,920 | $0 | $117,680 | $7,283 |
| Oct 2027 | $67,200 | $40,560 | $11,160 | $0 | $118,920 | $8,034 |
| Nov 2027 | $50,400 | $27,040 | $9,920 | $0 | $87,360 | ($11,086) |
| Dec 2027 | $33,600 | $27,040 | $9,920 | $0 | $70,560 | ($21,264) |
Revenue opens at $16,000 in January, climbs with the spring hail season to $168,700 in May, which is 14.6% of Year 1 revenue, and eases to $70,560 in December. Seventeen of the 40 storm re-roofs complete in April, May and June. EBITDA is negative from January to April (a combined $122,887) and in August, November and December, and positive in May, June, July, September and October. The month-end cash figure here is the monthly view's balance minus 27 days of that month's revenue, and it is lowest in May 2027, at about $217,000, because May completions leave the largest unpaid balance. Measured the same way December ends near $288,000, against $291,259 in the cash table, which uses the year-end receivables balance. The monthly view has no receivables or payables timing and spreads loan payments evenly, so both figures are approximate. Crew B joins for May to July because Crew A alone would face 156% of its crew-days in May and 129% in June. Years 2 to 5 have no monthly view, so the Year 2 winter trough is not modeled.
Crews and office, by month
| Role | Annual wage | Starts | Year 1 end | Year 2 end | Year 3 end | Year 4 end | Year 5 end |
|---|---|---|---|---|---|---|---|
| Owner: estimator, sales lead and insurance supplements | $75,000 | Month 1 | 1 | 1 | 1 | 1 | 1 |
| Scheduling and office coordinator (part time, 20 hours a week, Year 1) | $22,000 | Month 1 | 0.5 | – | – | – | – |
| Project and scheduling coordinator (full time from month 13) | $44,000 | Month 13 | – | 1 | 1 | 1 | 1 |
| Crew A foreman | $60,000 | Month 1 | 1 | 1 | 1 | 1 | 1 |
| Crew A roofer 1 | $46,000 | Month 1 | 1 | 1 | 1 | 1 | 1 |
| Crew A roofer 2 | $46,000 | Month 1 | 1 | 1 | 1 | 1 | 1 |
| Crew A laborer | $40,000 | Month 1 | 1 | 1 | 1 | 1 | 1 |
| Sales and claims representative 1 | $34,000 | Month 4 | 1 | 1 | 1 | 1 | 1 |
| Crew B foreman (May to July in Year 1, year-round from month 13) | $60,000 | Month 5 | – | 1 | 1 | 1 | 1 |
| Crew B roofer 1 (May to July in Year 1, year-round from month 13) | $46,000 | Month 5 | – | 1 | 1 | 1 | 1 |
| Crew B roofer 2 (May to July in Year 1, year-round from month 13) | $46,000 | Month 5 | – | 1 | 1 | 1 | 1 |
| Crew B laborer (May to July in Year 1, year-round from month 13) | $40,000 | Month 5 | – | 1 | 1 | 1 | 1 |
| Billing and insurance-claims administrator | $42,000 | Month 16 | – | 1 | 1 | 1 | 1 |
| Sales and claims representative 2 | $34,000 | Month 27 | – | – | 1 | 1 | 1 |
| Crew C foreman (April to September, Years 3 to 5) | $60,000 | Month 28 | – | – | – | – | – |
| Crew C roofer 1 (April to September, Years 3 to 5) | $46,000 | Month 28 | – | – | – | – | – |
| Crew C roofer 2 (April to September, Years 3 to 5) | $46,000 | Month 28 | – | – | – | – | – |
| Crew C laborer (April to September, Years 3 to 5) | $40,000 | Month 28 | – | – | – | – | – |
| Production manager | $72,000 | Month 37 | – | – | – | 1 | 1 |
| Total payroll incl. on-costs | $469,510 | $739,650 | $915,667 | $1,010,420 | $1,010,420 |
January opens with Dale, a part-time coordinator and Crew A: a foreman, two roofers and a laborer. The first sales and claims representative starts in month 4 (April 2027), ahead of the spring hail season, and Crew B, with the same four roles, works May to July 2027 and again from month 13 (January 2028) year-round. The full-time coordinator replaces the part-time role in month 13, the billing and insurance-claims administrator starts in month 16 (April 2028), the second sales representative in month 27 (March 2029), Crew C in April of 2029 (its $86,000 kit bought that March) and each year after through September, and the production manager in month 37 (January 2030). Each seasonal crew shows a dash in the year-end columns because the table counts headcount on December 31. Every crew member is a W-2 employee; none is a subcontractor. Dale's $75,000 is charged inside payroll, so profit is what remains after he is paid. Each hire waits for the work the crew table counts.
Profit and loss
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
|---|---|---|---|---|---|
| Revenue | $1,155,960 | $2,152,453 | $2,881,829 | $3,252,196 | $3,512,939 |
| Direct costs (shingles and underlayment, flashing and fasteners, dumpsters and disposal, permits, delivery) | ($455,630) | ($848,404) | ($1,135,893) | ($1,281,875) | ($1,384,649) |
| Gross profit | $700,330 | $1,304,049 | $1,745,936 | $1,970,321 | $2,128,290 |
| Payroll incl. on-costs | ($469,510) | ($739,650) | ($915,667) | ($1,010,420) | ($1,010,420) |
| Rent | ($46,800) | ($48,200) | ($49,600) | ($51,100) | ($52,600) |
| Utilities | ($6,000) | ($6,200) | ($6,400) | ($6,600) | ($6,800) |
| Marketing | ($66,000) | ($88,000) | ($100,000) | ($104,000) | ($108,000) |
| Insurance | ($40,000) | ($52,000) | ($60,000) | ($65,000) | ($68,000) |
| Professional fees | ($14,000) | ($16,000) | ($17,000) | ($18,000) | ($19,000) |
| Software subscriptions | ($11,000) | ($14,000) | ($16,000) | ($17,000) | ($18,000) |
| Sales commissions (2.5% of re-roof revenue) | ($26,264) | ($46,128) | ($59,835) | ($66,600) | ($71,537) |
| Consumer financing dealer fees and card fees (1.6% of sales) | ($18,495) | ($34,439) | ($46,109) | ($52,035) | ($56,207) |
| Workmanship-warranty callbacks and bad debt (1.4% of sales) | ($16,183) | ($30,134) | ($40,346) | ($45,531) | ($49,181) |
| Direct-cost mix allowance (commercial work carries a heavier material share) | $0 | ($16,806) | ($34,857) | ($44,937) | ($51,014) |
| Truck fuel, tires, repairs and registration | ($30,000) | ($52,000) | ($60,000) | ($66,000) | ($70,000) |
| Aerial measurement reports, estimating-software add-ons and drone inspections | ($9,000) | ($15,000) | ($18,000) | ($19,500) | ($20,500) |
| Fall-protection and safety training, PPE and uniforms | ($8,000) | ($12,000) | ($15,000) | ($16,500) | ($17,500) |
| Overtime for work beyond crew capacity in the spring storm peak | ($6,000) | ($16,000) | ($8,000) | ($14,000) | ($23,000) |
| Tool and safety-gear replacement | $0 | ($9,000) | ($13,000) | ($16,000) | ($18,000) |
| Licenses, registration renewals and continuing education | ($900) | ($1,600) | ($1,900) | ($2,200) | ($2,300) |
| Annual pay raises (3% a year) | $0 | ($22,190) | ($55,764) | ($93,693) | ($126,817) |
| EBITDA | ($67,822) | $84,702 | $228,459 | $261,205 | $339,414 |
| Depreciation | ($34,321) | ($34,321) | ($47,768) | ($47,768) | ($47,768) |
| Interest | ($29,653) | ($26,685) | ($22,888) | ($18,692) | ($14,057) |
| Income tax | $0 | $0 | ($12,008) | ($47,050) | ($67,065) |
| Net income before start-up costs | ($131,796) | $23,695 | $145,795 | $147,694 | $210,523 |
| Start-up costs expensed at opening (legal, registrations, pre-opening rent and pay, launch marketing) | ($69,900) | $0 | $0 | $0 | $0 |
| Net income after start-up costs | ($201,696) | $23,695 | $145,795 | $147,694 | $210,523 |
The Year 1 loss is $131,796 before start-up costs and $201,696 once the $69,900 of start-up costs is charged. Year 2 delivers the first profit, $23,695, an EBITDA margin of 3.9%. Net income then runs $145,795 in Year 3, $147,694 in Year 4 and $210,523 in Year 5, at EBITDA margins of 7.9%, 8.0% and 9.7%. Net income is nearly flat between Years 3 and 4 even though EBITDA grows by $32,746, because income tax rises from $12,008 to $47,050 as the Year 1 loss is used up and pay raises grow from $55,764 to $93,693. The gross profit line subtracts only materials, disposal and permits, so its 60.6% is not comparable with margins that also deduct crew labor, and after the mix allowance Year 5's true figure is 59.1%.
Cash: payroll, supplier terms and loan payments
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
|---|---|---|---|---|---|
| Cash from operations | ($227,918) | $5,825 | $155,362 | $176,064 | $244,635 |
| Trucks, trailers, tools and shop improvements | ($224,000) | $0 | ($86,000) | $0 | $0 |
| Funding received | $760,000 | $0 | $0 | $0 | $0 |
| Bank loan principal repaid | ($16,824) | ($36,268) | ($40,065) | ($44,261) | ($48,895) |
| Owner distributions | $0 | $0 | $0 | ($40,000) | ($80,000) |
| Net change in cash | $291,259 | ($30,442) | $29,296 | $91,803 | $115,739 |
| Closing cash | $291,259 | $260,816 | $290,113 | $381,916 | $497,655 |
Operating cash flow is negative $227,918 in Year 1, which takes in $69,900 of start-up costs and an $85,509 receivables balance at year end, partly offset by $24,966 owed to suppliers. Closing cash is $291,259 after Year 1, with the $8,000 deposit inside it, and dips to $260,816 in Year 2 as receivables grow to $159,223 and loan principal reaches $36,268. It then rises to $290,113, $381,916 and $497,655; Year 3 includes the $86,000 Crew C kit. Principal repaid is $16,824 in Year 1, when the loan is interest only for six months, then $36,268, $40,065, $44,261 and $48,895. Distributions are $40,000 in Year 4 and $80,000 in Year 5.
Balance sheet
| At year end | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| Cash | $291,259 | $260,816 | $290,113 | $381,916 | $497,655 |
| Accounts receivable | $85,509 | $159,223 | $213,176 | $240,573 | $259,861 |
| Trucks, trailers, tools and shop improvements (net) | $189,679 | $155,357 | $193,589 | $145,821 | $98,054 |
| Total assets | $566,447 | $575,396 | $696,878 | $768,311 | $855,570 |
| Accounts payable | $24,966 | $46,488 | $62,241 | $70,240 | $75,871 |
| Bank term loan | $283,176 | $246,909 | $206,843 | $162,583 | $113,687 |
| Paid-in capital | $460,000 | $460,000 | $460,000 | $460,000 | $460,000 |
| Retained earnings | ($201,696) | ($178,001) | ($32,206) | $75,488 | $206,012 |
| Total liabilities and equity | $566,447 | $575,396 | $696,878 | $768,311 | $855,570 |
Margins, debt cover and break-even
| Measure | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| EBITDA margin | -5.9% | 3.9% | 7.9% | 8.0% | 9.7% |
| Net margin (before start-up costs) | -11.4% | 1.1% | 5.1% | 4.5% | 6.0% |
| Payroll incl. pay raises as share of revenue | 41% | 35% | 34% | 34% | 32% |
| Revenue per full-time equivalent at year end | $177,840 | $179,371 | $221,679 | $232,300 | $250,924 |
| Average monthly revenue | $96,330 | $179,371 | $240,152 | $271,016 | $292,745 |
| Monthly revenue needed to cover operating costs | $105,659 | $167,720 | $208,728 | $235,088 | $246,059 |
| Debt service cover (EBITDA / interest + principal) | -1.5x | 1.3x | 3.6x | 4.1x | 5.4x |
Average monthly revenue in Year 1 is $96,330 against $105,659 needed to cover operating costs, about $9,300 a month short. Year 2 clears the bar with $179,371 against $167,720, and Year 3 with $240,152 against $208,728. Payroll including pay raises is 41% of Year 1 revenue, 35% in Year 2, 34% in Years 3 and 4 and 32% in Year 5. Debt service cover is negative in Year 1 because EBITDA is a loss, and it is 1.35x in Year 2 (shown as 1.3x in the table, which rounds once from the same figure). That passes a likely 1.25x test with little room.
A slow market: sales 20% below plan
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
|---|---|---|---|---|---|
| Revenue | $924,768 | $1,721,962 | $2,305,463 | $2,601,757 | $2,810,351 |
| Net income before start-up costs | ($252,811) | ($81,638) | $95,566 | $58,105 | $73,397 |
| Net income after start-up costs | ($322,711) | ($81,638) | $95,566 | $58,105 | $73,397 |
| Closing cash | $182,353 | $57,016 | $116,277 | $148,924 | $196,822 |
Revenue is 20% below plan on every line and in every year, and Dale reacts in stages. His pay drops 15% from July 2027 (month 7). The billing and claims administrator starts in month 22 instead of 16, the second sales representative in month 33 instead of 27 and the production manager in month 43 instead of 37. Crew C is never hired, so its $86,000 kit is never bought. Crew B works March to November in Years 2 and 3 and is year-round again from month 37 (January 2030). Marketing is cut 15% from Year 2, with the Year 1 launch and running spend left as planned. Sales commissions, financing and card fees, warranty and bad debt and the mix allowance fall with sales, and no distributions are paid. Overtime follows the crew-day method at $1,200 per excess crew-day: $6,000, $6,000, $27,000, $31,000 and $37,000, because at 80% of volume crews A and B use 86% to 90% of their crew-days in Years 3 to 5, with the May peak at 140% to 159%. Everything else, including the rest of payroll, rent, insurance, fuel and tool replacement, is not reduced. The lowest year-end cash is $57,016, at the close of Year 2 ($49,016 without the deposit), and cash is below the base case in every year. The lowest Year 1 month-end balance on the page's basis is about $180,000, in December 2027. Net income is a loss in Years 1 and 2 and then $95,566 in Year 3, $58,105 in Year 4 and $73,397 in Year 5. Year 1 equity ends at $137,289. Debt service cover runs -4.06x, -0.33x, 2.43x, 1.77x and 1.93x in Years 1 to 5, which fails a likely 1.25x test in Years 1 and 2 and clears it from Year 3 onward. Dale would ask the bank to waive the test at the end of 2027 and 2028 and measure 1.25x from 2029, to require a minimum year-end cash balance of $25,000 that leaves out the shop deposit, and to bar distributions until the test is passed. Only Year 1 has a monthly view; Years 2 to 5 are year-end figures, so the Year 2 winter and spring balances are not shown.
Stress Tests and the Lender's Follow-Up Questions
How the stress tests are built
Each row alters the single input named in it. Only the lines tied to sales move with it: sales commissions (2.5% of re-roof revenue), financing and card fees (1.6% of sales), warranty and bad debt (1.4% of sales) and the direct-cost mix allowance are recalculated on that row's own revenue, and every revenue line keeps its own direct-cost rate. A revenue row removes the line's revenue and its own direct cost together. No management response is applied, payroll, marketing and rent stay as planned, and the Year 4 and Year 5 distributions are still paid. The engine recomputes tax in each row. Debt cover is EBITDA over interest plus principal. The last column is the lowest of the five year-end balances, with its year, and every cash figure includes the $8,000 shop deposit.
| Case | Year 1 net income | Year 2 net income | Year 3 net income | Debt cover Year 2 | Debt cover Year 3 | Lowest year-end cash |
|---|---|---|---|---|---|---|
| Base case | ($201,696) | $23,695 | $145,795 | 1.35x | 3.63x | $260,816 (Year 2) |
| Revenue 10% below plan on every line and year | ($265,636) | ($93,959) | $1,326 | -0.52x | 1.14x | ($62,052) (Year 5) |
| Storm and claim re-roofs 30% below plan in Year 2 only | ($201,696) | ($168,689) | $157,803 | -1.71x | 3.63x | $86,920 (Year 2) |
| Storm and claim re-roofs 50% below plan in Year 2 only | ($201,696) | ($296,948) | $157,803 | -3.75x | 3.63x | ($29,013) (Year 2) |
| Storm and claim re-roofs 50% below plan in every year | ($384,816) | ($296,948) | ($259,881) | -3.75x | -3.01x | ($1,200,697) (Year 5) |
| Materials and disposal 10% more expensive, no price pass-through | ($247,259) | ($62,825) | $40,728 | -0.03x | 1.77x | $59,186 (Year 3) |
| All wages 10% higher, owner included | ($248,647) | ($52,488) | $60,660 | 0.14x | 2.09x | $81,843 (Year 3) |
| Workers' compensation 10 points higher on crew payroll | ($225,696) | ($15,857) | $106,880 | 0.72x | 2.82x | $187,646 (Year 3) |
| Receivables at 45 days instead of 27 (cash only) | ($201,696) | $23,695 | $145,795 | 1.35x | 3.63x | $147,995 (Year 3) |
| Supplier credit withdrawn, materials paid on delivery (cash only) | ($201,696) | $23,695 | $145,795 | 1.35x | 3.63x | $214,328 (Year 2) |
| Opening slips two months (revenue only) | ($289,703) | $23,696 | $157,803 | 1.35x | 3.63x | $172,871 (Year 2) |
| Slow-market case with its responses (the section above) | ($322,711) | ($81,638) | $95,566 | -0.33x | 2.43x | $57,016 (Year 2) |
The opening-slip row moves revenue only. The Year 1 revenue curve shifts two months later, so the last two months of its sales ($157,920) fall outside Year 1 and are not added to Year 2, while crew pay, rent, insurance, marketing and every other cost stay on their original dates and the percent-of-sales lines follow the lower revenue. Years 2 and later are unchanged before tax. Year 3 net income is higher in that row and in the Year 2 storm rows because the bigger loss carried forward shelters tax.
Reading the table
The base case is thin in Year 2. Debt cover is 1.35x, and a likely 1.25x test passes with room for only a small miss. Seven of the ten single-change rows push Year 2 cover under 1.25x, and each of them turns Year 2 into a loss: revenue 10% lower (-0.52x), claim work 30% or 50% lower in that year (-1.71x and -3.75x), claim work 50% lower in every year (-3.75x), materials 10% more expensive (-0.03x), wages 10% higher (0.14x) and workers' compensation 10 points higher (0.72x). The 10% revenue row shows the fragility best: Year 3 earns $1,326, and with distributions still being paid the company is overdrawn from the end of Year 3 ($20,857) and by $62,052 at the end of Year 5.
Claim work is the exposure. A Year 2 with half the planned claim re-roofs overdraws the company by $29,013 at year end, before any cash floor, and the reserve does not cover it. Claim work 50% lower in every year describes a different business: it loses money in all five years, and retail and repair work cannot carry the crews and overhead. The slow-market case, with its responses, is the one the reserve is sized to.
The two cash-only rows show the payment-timing exposure with no change in profit. Receivables at 45 days take $106,148 off Year 2 year-end cash and bring the lowest Year 1 month-end balance from about $217,000 down to about $116,000. Cash terms with no supplier credit take $46,488 off Year 2 cash. The reserve covers either alone, and the slower claim book is the likelier of the two.
The slip row costs $88,007 of Year 1 net income, and the lowest Year 1 month-end balance on the page's basis falls from about $217,000 in May to about $86,000 in July 2027. The reserve covers it by itself.
What a lender would still ask
- Registration and the endorsement: the Board's registration filed in December 2026, the 10-hour course or exam booked for early 2027, and the commercial endorsement in hand before the first flat-roof bid. A two-month late start is covered; a refused registration is not a case the model runs.
- Hail dependence: the share of revenue from claim work (58% in Year 1), the adjuster and insurer relationships behind it, and the plan for a quiet year. A standby line is the answer. With claim re-roofs 50% below plan in Year 2 the company is $29,013 overdrawn at year end, and a $100,000 standby line (interest not modeled) covers that and the $25,000 floor, leaving about $46,000 for an in-year trough the monthly view cannot show; Year 3 also ends $18,523 overdrawn in that case.
- Receivables on claims: a monthly aging report of insurer-paid balances, how much of each claim job sits in the recoverable-depreciation holdback, and a collection rule for lender-held funds. The 45-day row prices a slower claim book.
- Supplier credit: the distributor's limit, the guarantee behind it and what late payment does to terms. The table prices terms of zero days.
- Workers' compensation: a broker's quote for the roofing class and the company's experience modification before the loan closes, plus the 10-point row.
- Productivity: 17 squares a day for a four-person crew is a planning figure. At 15 a day a fourth crew arrives early.
- Sales capacity: Year 2 needs about 580 re-roof inspections at a 20% close rate (116 re-roofs), carried by Dale and one sales representative; a second representative joins in March 2029.
- Crew retention: how a seasonal Crew C is rehired each March, and the pay rates against the Oklahoma City market.
- Debt cover: 1.35x in Year 2 of the base case. Dale would ask for the 1.25x test to be waived at the end of 2027 and 2028 and measured from 2029, for a $25,000 year-end minimum cash balance that excludes the shop deposit, and for distributions to wait until the test passes. Those terms cover every slow-market year that falls under 1.25x (Years 1 and 2).
- The size of the raise: $760,000 against a lowest base-case month-end balance of about $217,000 on the page's basis. The slow-market case, which bottoms out at $57,016, explains the difference. A smaller raise with a $100,000 standby line is an alternative Dale would discuss.
- Collateral and the guarantee: $154,000 of trucks and trailers and $50,000 of tools at cost against a $300,000 loan, and the paperwork behind Dale's $322,000 of savings.
- The lease: the term, the personal guarantee and the $8,000 deposit, which every cash figure here includes.
Sources
- Oklahoma Insurance Department, press release of June 29, 2026: share of Oklahoma roofs hit by severe hail (Verisk data) and the average roof replacement cost in 2025.
- Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025 estimates for the Oklahoma City metropolitan area: roofers, construction laborers, first-line supervisors of construction trades and estimators.
- Oklahoma Construction Industries Board, roofing registration requirements and notice of the new Residential Roofing Endorsement (House Bill 1628, Senate Bill 1873 and House Bill 3800), June 8, 2026.
- Oklahoma Construction Industries Board, roofing contractor registration and commercial endorsement application, the 2022 form: fees and liability minimums.
- Roofing Contractor magazine, new Oklahoma law restricts roofing contractors from waiving deductibles: House Bill 1940, effective November 1, 2022. A secondary source; counsel confirms the current statute.
- CBRE, Oklahoma City industrial figures, Q2 2026: average net asking rent of $7.64 a square foot, report dated August 24, 2026.
- Occupational Safety and Health Administration, 29 CFR 1926.501, duty to have fall protection.
- Cornell Legal Information Institute, 26 U.S.C. 11(b): the 21% federal corporate rate.
- Oklahoma corporate income tax rate of 4%: reported by secondary sources; the Oklahoma Tax Commission publishes the current rate.
Get a plan as complete as this one
Start with a free 30-minute call. We recommend a package and send a fixed quote.
Starter
$997 written for you
A dedicated writer builds your plan on our software, with a financial model and a 1-hour analyst review.
Book my free consultation →Pro
$2,997 written for you
A researcher, an accountant and a senior consultant. 5-year model.
Book my free consultation →Enterprise
$4,997 written for you
For multi-site or high-raise plans that need deeper modelling.
Book my free consultation →Need a roofing business plan for your own business? Book a free consultation and we write it for you. Writing it yourself? Get the free template in Word and PDF.